Anzio (RM) – 2019

Anzio (RM) – 2019

Authorization development Complete construction of the 50,000 ton / year waste / OFMSW treatment plant 3,300,000 Smc / year Biomethane produced Biomethane Upgrading Plant with chemical absorption with inorganic salts
Aprilia (LT) – 999,00 kWe

Aprilia (LT) – 999,00 kWe

Revamping biogas production plant – Aprilia (LT) Rated Power: 999,00 kWe Motors Type: JMS 320 GS-B.L Digester number: 2 + external reservoir
Velletri (RM) – 999kWe

Velletri (RM) – 999kWe

Revamping biogas production plant – Velletri (RM) Rated Power: 999,00 kWe Digester number: JMS 416 GS-B.L Numero Digestori: 2 + serbatoio esterno